Image
 Holy Moly!  It's been a while since the last update here.  I guess the excitement of the new build has us playing hooky from real work.   Exciting times, as we are just about to get a slab poured this week.  Kevin and his guys have been done framing for nearly a month now, and we are waiting on windows to be delivered, a slab to be poured and material for him to come back to our site.  The slab being poured will change everything.  The look and feel of the space will be completely different and we can start envisioning where the floor plan will lay out.  Prior to this point, we spent a long time making sure our under slab plumbing and electrical were correct, installing our slick "slot drain" floor drain system, and putting down foam and a vapor barrier.  A lot of work done just to be covered up by concrete! Once we have a the slab in place, we can frame the last of the interior walls and invite the trades in to start their rough in work. ...